Finance, inventory, manufacturing and order to cash on one system of record, delivered in phases with a gate between each one.
An ERP is the current running underneath an operation: orders, inventory, money and decisions moving from where they are to where they need to be. When it is implemented well nobody talks about it. When it is not, the workarounds become the process and the spreadsheets become the real system.
General ledger, multi-entity consolidation, revenue recognition, and a close that stops taking two weeks.
Multi-site stock, demand planning, replenishment, landed cost, and a number everyone trusts.
Bills of material, routings, engineering change, MRP runs, scheduling and shop-floor execution.
Quoting, fulfillment, billing and collections, with the handoffs between them removed.
Nothing moves forward on optimism. Each phase has an exit condition that someone on your side signs.
Two weeks against processes, data and team. We report what we find, including when the honest answer is that software is not your problem.
Configuration wherever the platform fits. Customization only where the business genuinely differs, and written down as a decision, not a preference.
Its own project, its own plan. Parallel runs and signed balances before anyone talks about a date.
Real scenarios on real data, run by the team that has to live with the result. Scripted, scored, and fixed before cutover.
A rehearsed plan with a rollback. The quiet go-live is the one that was boring to watch.
Ninety days in the building, then the week-one baseline re-measured. Adoption is in scope from the first week.
We don’t only implement AI. We implement with it.
Discovery, data migration, configuration, testing and documentation all run with AI inside our own process. That changes the economics of the project itself, and not only the software at the end of it.
Work that took weeks of manual effort takes days, so go-live arrives sooner and the return starts earlier.
Fewer billable hours to the same outcome. The efficiency shows up in your budget before it shows up in our margin.
Automated test generation and reconciliation catch what manual review misses.
You inherit a system with current documentation, which almost never happens.
For a single-entity business on a clean scope, three to five months. Multi-entity, multi-currency or manufacturing operations with MRP and shop-floor execution usually run six to nine. The variable that moves the date most is rarely the software. It is the state of the data and how quickly decisions get made.
Almost never because the software could not do the job. They fail because the scope was wrong before anyone started, because master data was dirtier than anyone admitted, or because the system went live and nobody used it. Each of those is visible early, which is why we diagnose before we design and treat migration as its own project.
It is driven by entities, users, integrations and how far your processes sit from platform standard. The single biggest cost multiplier is customization, so we configure wherever the standard fits and build only where your business genuinely differs. Every dollar of custom code is a dollar of future maintenance.
Phased, in most cases. A phased rollout lets you prove the model on one entity or one site before committing the rest of the business, and it keeps the operation shipping while the work happens. Big bang is right when entities are tightly coupled and running two models in parallel would cost more than the risk it removes.
Yes. Bill of materials, routings, engineering change, MRP runs, production scheduling, shop-floor execution, and make-to-stock, make-to-order and engineer-to-order models. Manufacturing is where the gap between a demo and a working system is widest, so it gets the most discovery.
Migration is run as a project of its own, with its own plan and its own gate. Extraction, cleansing, mapping, parallel reconciliation and signed balances before cutover. Most go-live failures are data failures, and they are the most preventable kind.
Thirty minutes, no commitment. We will tell you what the friction is costing and whether we are the right people to remove it.
hello@quietcurrent.io