Manufacturing

The system has to match how the floor actually runs.

Bills of material, routings, engineering change, MRP, scheduling and costing, for make-to-stock, make-to-order and engineer-to-order operations.

Where it usually breaks

Where a demo and a working system diverge.

Manufacturing is where the gap between a demo and a working system is widest. A platform that looks capable in a scripted walkthrough meets a real routing, a real engineering change and a real costing method, and the gaps appear in month four.

Product structure

Multi-level bills of material, routings, work centers, and engineering change that does not require a rebuild.

Planning and scheduling

MRP runs that people trust, finite capacity where it matters, and a schedule the floor actually follows.

Shop-floor execution

Work order issue and completion, labor and machine time, scrap and rework, lot and serial traceability, in the ERP or in a purpose-built execution layer where the floor needs more resolution than a system of record holds.

Costing

Standard versus actual, WIP valuation, variance analysis, and a margin number the controller will defend.

Before we change anything

What manufacturers tell us is wrong

These come up in almost every first conversation. Any of them is a symptom of the same thing: information that stops moving.

How we start

We measure the noise. Then we remove it.

Five figures recorded before anything changes and re-recorded at go-live: touches per order, days to close, exceptions per thousand, reconciliation hours, and how old the data is when someone acts on it. The difference between the two is the engagement.

Take the readiness assessment
Questions we get asked

Common questions

Can you implement MRP?

Yes. MRP is the core of this practice: demand and supply netting, planned order generation, lead-time and lot-sizing rules, exception messages people actually act on, and the master data discipline that makes the output trustworthy. An MRP run is only as good as the bills of material and lead times behind it, so that is where the work starts.

Do you handle engineer-to-order and configured products?

Yes. Engineer-to-order, make-to-order, configure-to-order and make-to-stock, including mixed-mode operations that run several of these at once. Mixed-mode is the common case in mid-market manufacturing and it is where generic implementations most often fail.

How do you handle product costing?

Standard or actual costing depending on how you run, with WIP valuation, labor and overhead absorption, and variance analysis that ties to the ledger. We involve our finance practice here by default, because costing decisions are accounting decisions wearing an operations hat.

What about quality and traceability?

Lot and serial control, inspection steps inside routings, non-conformance and corrective action, and genealogy from raw material to shipped unit. For regulated products, traceability is designed in at the start, not added when an auditor asks.

How long does a manufacturing ERP implementation take?

Six to nine months for a single plant with real manufacturing complexity. Multi-site runs longer and is usually phased by plant, and the sequencing is something our implementation practice plans up front. The schedule is set by the state of your bills of material and routings more than by anything else. If the product data is clean, everything downstream moves faster.

Start here

Tell us where things are slow.

Thirty minutes, no commitment. We will tell you what the friction is costing and whether we are the right people to remove it.

hello@quietcurrent.io